ROAD WORK

¿WHAT DO WE DO?

The company has vast specialization in the construction of road infrastructure works for various public institutions in the country.

Our experience in the management and execution of works with rigid and flexible pavements, drainage systems, soil movements, quarry operations, industrial plants, asphalt mix production plants, material crushing plants, soil plants, concrete dosing plants, among others, is backed up by several developed projects.

LATEST WORKS

These are the latest works in this area:

(MOPC) SG MINISTER CONTRACT No. 108/2010 Development Project of the Asunción Strip, Bañado Norte, 1st. Stretch, Module Avenida Costanera Norte of the Historic Center Section from Asunción Port to General Santos Avenue (Asunción, Paraguay)

Name of the Contract: (MOPC) SG MINISTER CONTRACT No. 108/2010 Development Project of the Asunción Strip, Bañado Norte, 1st. Stretch, Module Avenida Costanera Norte of the Historic Center Section from Asunción Port to General Santos Avenue (Asunción, Paraguay).
Brief Description of the project: Four lanes, paving and urban planning, filling and fluvial defenses, coastal walk and connecting roads, pavements, drains and reinforced concrete bridges, vertical drains, pastures, reindeer mattress, excavations and soil embankment.
Length : 3,80 km.
Reflow volume : 2,441,293.11 m 3
Asphalt Paving Length : 3,520 km.
Reindeer mattress surface : 90. 000 M 3

(EBY) Contract Nº 508/07 - Construction of Road Works in Paraguay Republic - Package "A" (Encarnación, Paraguay)

Name of the Contract: (EBY) Contract Nº 508/07 – Construction of Road Works in Paraguay Republic – Package “A” (Encarnación, Paraguay).
Brief Description of the project: Asphalt paving, reinforced concrete bridges:
1. Quiteria Brigde – 660mts of prestressed concrete bridge
2. Santa María Bridge – 2 bridges of 330mt each, double lane-prestressed concrete bridge
3. Yacu Paso 180mts post-tensioned concrete bridge
4. Mborore – 50mts reinforced concrete bridge. Duplication Access to Encarnación, Quiteria.

PRESTRESSED CONCRETE BRIDGE – QUITERIA ACCESS TO ENCARNACION
Length: 660mts – 7.6 km – 4 lanes
Duplication access to Encarnación Arroyo Porá, Ruta 6ta.

SANTA MARÍA ARMADO CONCRETE BRIDGE
Length: 330 meters – 5.8 km – 4 lanes, plus collective streets

(MOPC) CONTRACT No. 415/2010 - Rehabilitation and Asphalt Paving Concepción - Vallemí Stretch - Program 51+000 to 111+063

Name of the Contract: (MOPC) CONTRACT No. 415/2010 – Rehabilitation and Asphalt Paving Concepción – Vallemí Stretch – Program 51+000 to 111+063
Brief Description of the project: Movement of soil embankment, excavations, various removals, granular subbase pavement, improved-cement floor, stabilized granular base, surface treatments Tri/Simp., reinforced concrete bridges and drainage works.
Length: 60km 
Embankment volume:  1,174,569,884 m3
Base and sub base for treatment: 114,342,824 m3
Surface Treatment Triple m2:  430,659,200 m2

(MOPC) CONTRACT NO: 53/2015 of 03/31/2015 - LPN of Specialized Construction Companies in Road Works for Highway Rehabilitation and Maintenance Contract by Service Levels (CREMA), Route No.4 “General José Eduvigis Diaz”, San Ignacio-Pilar Stretch. AD Referendum to the PGN 2015.

Name of the Contract: (MOPC) CONTRACT NO: 53/2015 of 03/31/2015 – LPN of Specialized Construction Companies in Road Works for Highway Rehabilitation and Maintenance Contract by Service Levels (CREMA), Route No.4 “General José Eduvigis Diaz”, San Ignacio-Pilar Stretch. AD Referendum to the PGN 2015.
Brief Description of the project: Rehabilitation and Maintenance of Roads
Total Reconstruction Length : 60 km.
Partial reconstruction length : 40 km
Asphalt Paving Length : 115 km
Maintenance for CREMA Service levels : 5 years

(MOPC) CONTRACT No. 420/2010 - Recoat of the Supercarretera Itaipú - Entrance to Itaipú Binacional - Puerto Presidente Franco Stretch.

Name of the Contract:(MOPC) CONTRACT No. 420/2010 – Recoat of the Supercarretera Itaipú – Entrance to Itaipú Binacional – Puerto Presidente Franco Stretch. 
Brief Description of the project: Bache Sup., Asphalt concrete binder 14,639.40m³, tack coat, signaling, metal railings, paving asphalt on cobbled stoned road, repair of several paving collateral streets and shoulders.
Recaled total length : 16 km of 4 lanes
Horizontal and Vertical signage: 12, 880.52 m 2
Bidirectional Reflective Studs : 11, 548 un

(MOPC) Rehabilitation and Paving of Route No. 11 “Juana de Lara” - Nueva Germania - San Pedro Stretch

Name of the Contract: (MOPC) Rehabilitation and Paving of Route No. 11 “Juana de Lara” – Nueva Germania – San Pedro Stretch
Total length: 48km.
Asphalt Paving: 13,786. 18 m3

(MOPC) Reconstruction and Repaving of the National Route No. 9 "Presidente Carlos Antonio López" – Rio Verde Km326 to Filadelfia Km443 Stretch (L = 14.7 km); km 480 to km 505.

Name of the Contract: : (MOPC) Reconstruction and Repaving of the National Route No. 9 “Presidente Carlos Antonio López” – Rio Verde Km326 to Filadelfia Km443 Stretch (L = 14.7 km); km 480 to km 505.
Brief Description of the project:  Reconstruction and repaving of routes
Asphalt Resurfacing : 156.7 km.
Recycling of Existing Pavements with cement : 102, 622 m 3
Total reconstruction : 50 km.